Trellising |
|
9th
April Spent
the afternoon ramming in an extra post between the fence posts at the
northern, top end of the field which will eventually become the straining
posts. 10th
April Run
out a line along the bottom of the field marked out for the straining posts
for that end. Then
run a north south line marked up with positions of trellis poles and vines. The
trellis will not be needed for a year or so, but decided to fit posts now to
take advantage of soft ground, and not wanting to disturb vines later in
their development. Photo
shows the first two runs with canes marking the positions of where the vines
will go. 23 runs to go.
|
|
11th
to 14th April Carried
on setting out grid with Hayley on the other end of the post rammer at about
6 runs per day, for anyone into going to the gym this is a great abs and arms
work out, boy do I ache!
|
|
15th
April Ably
assisted by Pete Restall, spent the day installing the straining wires at
each end of the runs. A
horizontal pole strained by a 45 degree wire twisted with a metal bar to take
up the tension.
|